This 2011-2013 study, "Cost of Project Delays: An Estimate of Foregone Benefits for Inland Waterways Projects" by HDR Decision Economics looks at societal cost resulting from delays to inland waterways infrastructure projects, the benefits foregone from those delays, and the costs imposed by those delays.